Document the existing service
Record rating, disconnect, panel condition, spaces, grounding, bonding, major loads and prior alterations. Explain the load basis and separate safety repair from optional future capacity.
A solar-ready scope begins with existing service, loads, roof or site conditions and utility requirements—not a module count. Washington L&I publishes electrical permit and contractor guidance, and PSE publishes customer-generation information for properties it serves. Confirm the exact Kent address and serving utility before accepting equipment or savings assumptions.
Require service and panel assessment, load and equipment assumptions, one-line design, mounting and pathways, shutdown plan, permits and utility duties, exact equipment, monitoring, labeling, testing and closeout.
Record rating, disconnect, panel condition, spaces, grounding, bonding, major loads and prior alterations. Explain the load basis and separate safety repair from optional future capacity.
State current usage, planned vehicle or heat-pump loads, resilience goals and roof constraints. List modules, inverter architecture, shutdown components, pathways and monitoring.
Identify roof material, condition, penetrations, attachment locations, drainage and access. Assign structural and weatherproofing verification and compare reroofing sequence if relevant.
Washington L&I publishes electrical permit and inspection guidance. Confirm the Kent address and assign applications, plans, corrections, inspections and final approval.
Confirm the serving utility. Where PSE serves the meter, follow its current customer-generation process. Utility permission and permit approval are separate steps.
Use Washington L&I records for the legal electrical contractor and workers. Identify which company designs, permits, installs, commissions and warrants each part.
State outages and essential-load needs. Verify protective devices, grounding, rapid shutdown, labels, monitoring and operation. Production alone is not complete commissioning.
Retain approved plans, permits, inspections, utility permission, equipment data, serials, warranties, photographs, monitoring access and shutdown instructions.
Describe the project once and we match it with vetted local pros who actually do this work — you choose who to hire, or nobody at all.
Washington L&I publishes permit and inspection guidance.
Customer generation follows serving-utility interconnection rules.
Washington L&I provides contractor and worker records.
| Decision | Incomplete scope | Complete scope |
|---|---|---|
| Service | Panel adequate | Rating, condition and load basis |
| Utility | Net metering | Serving utility and steps assigned |
| Design | Standard system | Equipment, pathways and one-line |
| Permits | Included | Authority and inspections named |
| Production | Savings | Inputs and exclusions disclosed |
| Closeout | System on | Tests, approvals, manuals and monitoring |
Separate assessment, design, permits, utility application, service or panel work, modules, inverter, mounting, pathways, monitoring, shutdowns and closeout. Require assumptions instead of unsupported savings claims.
No. It depends on documented service condition, capacity, loads and connection method.
No. They are separate processes.
Confirm the exact address and assign permit and inspection responsibility.
Use Washington L&I records for the exact legal business and applicable credentials.
Treat projections as assumptions unless a contract specifically supports the claim.
Protective functions, grounding, shutdown, labels, monitoring and operation relevant to scope.
It can, but compare roof condition and future removal responsibility first.
Keep plans, approvals, data, warranties, photos, monitoring and shutdown instructions.
Share service, loads, roof and utility information.
Start a Solar Request100% free · No obligation · Takes about 2 minutes — only matched pros ever see your number